Content & Answer Pages · 8 min read · September 25, 2026 · Hafsa Tariq, gaash.ai
What building owners ask assistants about architects, stage by stage
Building owners ask about an architect in the order of their project: whether the lot allows it, which firm to hire, what it costs and on what contract, how long approvals take, and what happens once building starts. A portfolio answers one of those stages. The questions below are examples, not a measured ranking; collect your own and answer each stage on the page it belongs to.
Why does a portfolio answer only one stage?
Because a portfolio answers one question: have you done this before. An owner asks it while choosing a firm, and the page for architecture firms covers what it takes to answer it. The rest of the owner's customer journey comes with questions of its own, asked before any firm is in mind and after one is hired, and a site made of project pages leaves them open. Which of the firm's names an answer uses, and where its principals are licensed, have articles of their own: AI visibility for architects and Architect nearby.
A question the site leaves open can still get an answer somewhere else: from another firm's page, a general article, or an assistant's training data. In our audit of 9,483 small business websites (40 trades, 90 metros, late August to early September 2026), 61.5% had no question-and-answer content of any kind, and half the sites (50.7%) had at least one heading phrased as a question with no answer under it that a machine could isolate. Both figures are sample-wide; we publish no architects-only cut.
One limit before the examples. We have not measured what building owners type into assistants. The questions on this page are written the way an owner might put them and grouped by stage; they are examples, not a count or a ranking, and the ones that matter for your firm are the ones your own clients ask.
Five stages, and where each answer lives on your site
Each stage has a page on a firm's site where its answers belong:
| Stage | Example questions, not measured | Where the answer lives |
|---|---|---|
| Feasibility | can I add a second story to my house in [town]; do I need an architect for a kitchen remodel | A page on your feasibility work: what you check, what it costs, how long it takes |
| Choosing a firm | architects who have done [type of project] near [town] | Your project pages, as the page for architecture firms describes |
| Fees and contract | how do architects charge for a new house; what does the design fee include | Your services page: the fee basis, and the phases your contract names |
| Time | how long does a building permit take in [town]; how long does it take to design a house | An approvals or process page, with dated ranges from your own projects |
| Construction and changes | how often does the architect visit the site; who approves changes during construction | A process page on construction administration, in your contract's terms |
Feasibility: the questions asked before anyone is hired
An owner at this stage has a lot and an idea: can I build this here, how big, and do I need an architect for it at all. The first answer depends on the lot, and the last on the rules where the lot is, which are not yours to state. What you can state is what you do: what your feasibility study checks, what it costs, how long it takes, and what the owner has at the end.
"[Firm]'s feasibility study checks [zoning, setbacks, height, easements and heritage status] for one lot, takes [number] weeks and costs [a fixed fee of amount]; you receive [a short report with a sketch of what fits]." That sentence answers the general question and describes the paid work in the same breath.
For "do I need an architect", say which projects the firm takes, which it sends elsewhere and to whom (a designer, a builder, an engineer), and point the owner to the building department where the site is for the rule itself.
Fees and contract: how you charge, in your contract's own words
Before an owner asks what you charge, they may ask how architects charge at all. Name the basis you use for each kind of project, whether a fixed fee, hourly rates, a share of the construction cost or a mix, and say what the fee covers and what it leaves out, such as consultants, surveys, permit fees and reimbursable costs.
| Fee basis | What the page states | Example |
|---|---|---|
| Fixed fee | The scope it covers, the phases, and what changes it | [Fixed fee of amount] for [scope], through [phase name] |
| Hourly | The rate for each role, an estimate of hours, how often you bill | [Rate] an hour for [role]; an estimated [hours] for [scope] |
| Share of construction cost | The share, what counts as construction cost, and when it is recalculated | [Share] of construction cost, recalculated at [phase name] |
Name the phases the way your own contract names them, since that is the document the owner will sign. If the contract calls them [phase one] to [phase five], the services page uses the same names, each with what it delivers and its part of the fee: "[Phase name]: [what is delivered]. [Share of the fee, or estimated hours]." Two firms' pages can then be set side by side without a translation.
Every figure on the page should be one you would put in a proposal, with the date it was set. A range drawn from your own recent work is a fact about the firm; a share quoted from someone else's survey is not.
Time: approval durations from your own projects, as dated ranges
"How long will the permit take" has no general answer, and a rule of thumb is wrong somewhere. What a firm has is its own record. State it as a range, with the projects it comes from and the years: "[4 to 7 months] for the three permits we took through [municipality] between [year] and [year]." The range says what happened, and the years say how old the evidence is.
Do the same for the firm's own phases: how long design and construction documents took on comparable projects, stated as ranges with their years. Update the ranges as projects finish, and take one down when the rules behind it have changed.
Where the municipality publishes its own review times, link to them beside your range, so the owner sees the rule and your record together.
Construction and changes: the questions after the contract is signed
Once building starts, the questions change: how often will you visit the site, who answers the contractor's questions, who approves a change, what a change costs, and what happens when the contractor finds something no drawing showed. Answered on the site, they also tell an owner who is still choosing how the firm works once the project is under way.
Answer in your contract's terms: what it calls construction administration, how often it puts you on site, how questions from the contractor and change orders pass through the firm, and how extra services are billed ([at hourly rates, or a fixed fee per change]).
Collect the questions your own clients ask
The examples here are a start; your own list is the one to answer, and three records hold it already. First-meeting notes hold the questions owners bring before they know you. Emails hold the ones they ask between meetings, in their own words. RFPs and RFQs hold an institutional client's questions in writing.
- Go through a year of first-meeting notes, sent emails and RFPs, and copy out every question an owner asked, in their words, with no names or addresses.
- Put each one under its stage: feasibility, choosing a firm, fees and contract, time, construction and changes.
- Count how often each comes up, and mark the ones your site does not answer today.
- Write each answer on the page where its stage lives, answer first and detail after.
- Add new questions as they arrive, and date each answer when you change it.
Writing to be cited sets out the answer-first shape that gives a passage citability, and the answer-page template shows a whole answer page built that way. Both fit an architect's services and process pages as they stand.
Common questions
Is answering feasibility questions giving away free work?
No, if the page answers the general question and leaves the lot to the study. Saying what a feasibility study checks, what it costs and how long it takes describes the paid work without doing it. The owner still needs someone to check their lot against their municipality's rules, and the page has told them who does that, and on what terms.
One FAQ page, or answers spread across the pages they belong to?
Spread, with each answer on the page for its stage: fees on the services page, durations on the approvals page, site visits on the process page. A short FAQ page can still exist as a list of questions with one-line answers that link to those pages. What goes wrong is two full versions of one answer, because one gets updated and the other does not.
What about questions nobody can answer before seeing the site?
Say so, then say what the answer depends on, how the firm finds out and what that costs: a site visit, a survey or a zoning check, each with its fee and timing in your own figures. "It depends on the slope, the soil and the setbacks; a site visit for [fee] settles which" is an answer an owner can act on.
Is FAQ markup worth adding?
Not for Google's results page. Google limited FAQ rich results to government and health sites in August 2023 and stopped showing them on May 7, 2026, so an architecture firm's FAQ schema earns no rich result there. The visible questions and answers are what any reader can use. If you add the markup anyway, keep it to what the page shows, as Google's structured data introduction asks.
Sources
The question-and-answer figures are this site's own, from the audit named below, and cover all 40 trades. The example questions were written for this page; they are not measured, counted or ranked.
Sources: our audit of 9,483 small-business sites, with its method · Google Search Central blog, changes to HowTo and FAQ rich results · Google, introduction to structured data · Google Search Central, documentation updates